"Other installations" and "Other measures"
the purpose of "Other installations" and "Other measures" is to support the efficient use of energy and promote the use of renewable energies. In particular, the degree of environmental impact, the use of renewable energies, the degree of self-sufficiency, energy efficiency, cost-effectiveness and the exemplary effect are taken into account in the assessment.
- Subsidies of up to CHF 400,000 can be granted for the construction of "Other installations and other measures".
- The decision on this is made by the Energy Commission.
Other installations
"Other installations" are large installations, such as large wood chip firing systems, which serve the purpose of the Energy Efficiency Act in a special way. These are, for example, building services installations from 1,750 m2 EBF or photovoltaic systems from 250 kWp.
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Förderantrag Haustechnikanlage (PDF), 01.02.2026
Onlineschalter Energieförderung
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Förderantrag Photovoltaikanlagen (PDF), Stand 01.02.2026
Onlineschalter Energieförderung
Other measures
"Other measures" serve the purpose of this Act (EEG) and/or an energy strategy adopted by the government (e.g. Energy Strategy 2020) in a special way, in particular energy consulting, increasing electricity efficiency in large buildings or efficiency programs.
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Individual measures include, for example, the replacement of lighting (LED) or circulation pumps, industrial motors, process steam systems, but also commercial waste heat recovery.
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Förderantrag "Andere Massnahmen" (PDF), 01.02.2026 (nicht im Onlineschalter verfügbar)
rel="noopener">Calculation tool for individual measures (Excel)
The procedure analysis and consultation for a potential refurbishment of buildings and building services systems is subsidized.
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Förderantrag "Andere Massnahmen" (PDF), 01.02.2026 (nicht im Onlineschalter verfügbar)
Remote heating control systems for existing, purely vacation homes in Alpine regions are subsidized.
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Förderantrag "Andere Massnahmen" (PDF), 01.02.2026 (nicht im Onlineschalter verfügbar)Information sheet on remote heating control (PDF)
On 31.08.2021, the Energy Commission passed a resolution to extend the line expansion impulse program outside the construction zone beyond the set framework of 1 MWp in connection with photovoltaic systems. The Energy Commission is promoting the expansion of lines outside the building zone as part of an impulse program until further notice without a direct power limit:
- The decisive factor for the assessment is the receipt of the application.
- The aim of the impulse program is the further construction of large PV systems to achieve the goals of the Energy Strategy 2030.
- Subsidies for line expansion can be applied for under "Other installations and other measures". The maximum contribution is capped at CHF 400/kWp of additional PV capacity, as the aim is to achieve the best possible cost/benefit ratio. An existing system is not taken into account when calculating the output.
- The subsidy is based on the proven eligible costs incurred for the line extension due to the installation of an additional PV system.
- The PV systems themselves can be subsidized separately according to the applicable subsidy rates
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.
Förderantrag "Andere Massnahmen" (PDF), 01.02.2026 (nicht im Onlineschalter verfügbar)
The funding application and the power of attorney must always be submitted in full and on paper, including all enclosures. Submissions by e-mail are not sufficient. The content of applications will only be processed once the application documents have been received in full.